Skip to main content

Bauer plant equipment and structures, 1923-1930

 File — Tube: 262
Identifier: XI

Scope and Contents

  1. Thickener superstructure (1929)
  2. Thickeners Laboratory, tube dewaterer installation (1928)
  3. Feed Thickener Foundations, supports and footings (1929)
  4. Zinc cleaner unit (1930)
  5. Sorting bin and belt-Butterfield, general drawing and bin details (1938)
  6. 300 ton crushing plant, foundation plan, building design and typical section drawings (1923)
  7. Crushing and storage plans (1924)

Dates

  • 1923-1930

Conditions Governing Access

Twenty-four hour advanced notice encouraged. Materials must be used on-site. Access to parts of this Collection may be restricted under provisions of state or federal law.

Extent

From the Collection: 148 Linear Feet

Language of Materials

From the Collection: English

Repository Details

Part of the J. Willard Marriott Library Special Collections Repository

Contact:
295 South 1500 East
Salt Lake City Utah 84112 United States
801-581-8863