Box 69
Contains 17 Results:
"Engineering Service Contract, Bountiful Water Sub-Conservancy District and Thomas C. Adams and Nielsen and Reeve, Consulting Engineers, Salt Lake City and Ogden, Utah"
"Specifications for Labor and Materials required for the Repairs of the Centerfield Pipe Line. Located in Sanpete County, Utah," PWA Docket #8078, 1934 November 6
"Specifications for Labor and Materials Required for the Construction of and Improvements to a Waterworks System for the Town of Emery, Emery County, Utah" PWA Docket #1672, 1936 November 6
"Specifications for Labor and Materials Required for the Construction of and Improvements to a Waterworks System for Garland City, Utah," PWA Docket #1002-R, 1936 August
"Specifications for Labor and Material required for the Construction of and Improvements to a Water System for the Town of Goshen, Utah," PWA Docket #1039-D, 1936 November 30
"Specifications for Labor and Materials required for the repairs of the Gunnison Pipe Line, located in Sanpete County, Utah," PWA Docket #4684, 1934 November 6
"Kanab Waterworks Project," PWA Docket #6951, "Specifications", 1934 December 10
North Salt Lake Correspondence, 1948-1954
Correspondence, 1955 January-December
Includes notice of Adams' dismissal from all duties and services.
Correspondence, 1956-1957
Includes billings for services rendered.
Reports
"Subdivision Standards, Davis County, Utah"; "Specifications for Motor Fire Apparatus for the Town of North Salt Lake"; Agreement between Salt Lake City and Salt Lake County Drainage District. No. 2, dated 1925; "Description, Annexation No. 1 to North Salt Lake City, Davis County, Utah, April 21, 1952.
General, 1952-1953
"Howard vs. North Salt Lake"-Petition and Complaint; Subpoena of Adams, August 1952; "Howard vs. No. Salt Lake"-Answer, August 1952; Minutes of Meeting, No. Salt Lake Board of Trustees, April 6, 1953.
"Plans, Specifications, and Other Contract Papers for the Construction of a Waterworks Improvement-1953 Constructino, Town of North Salt Lake", 1953 September
Minutes of Meeting, North Salt Lake Board of Trustees, 1953 October 19
"Contract Between O. S. L. R. R., U. P. R. R. and Town of North Salt Lake, 1954"; Pipe Line Agreement, Bamberger R. R. and Town of North Salt Lake, 1954.
"Instructions, Specifications, and Other Contract Papers... Drilling of a Water Well...Town of North Salt Lake...", 1954 May
"Plans, Specifications, and Other Contract Papers...Water Works Improvement-Initial Pipe Line Construction, 1954, Town of North Salt Lake...", 1954 May
General, 1954-1955
"Agreement for the Supply of Water Service for Fire Protection"; "Notice, Special Bond Election, April 27, 1955"; Minutes of Meeting, North Salt Lake Board of Trustees, May 16, 1955.